AWARCHAEOLOGY WORLDField atlas · Ostia

Plans · sections · proposals · original spatial readings

Ostia.
Architecture in its evidence.

Compare buildings, follow a drawing back to its source, and see what has been admitted to the interactive readings.

4 interactive cases38 drawing records13 candidate records

Record counts include drawing series and research leads. They do not certify complete consultation or a measured whole-site model.

Beyond the first monument

Explore the architectural cases.

Interactive architectural reading

Ostia · Capitolium · Capitolium: cella, porch and ascent

Original reduced spatial reading: Ostia · Capitolium · Capitolium: cella, porch and ascent

A restrained cutaway explains the plan’s principal spaces. It adds no roof, complete column order, cult statue or measured ancient height.

normalized diagram units · 9 qualified parts · 1 reading settings

Explore plan & 3D ↗
Interactive architectural reading

Ostia · Baths of Neptune · Neptune: thermal rooms and exercise court

Original reduced spatial reading: Ostia · Baths of Neptune · Neptune: thermal rooms and exercise court

A normalized relational cutaway selects the six labelled spaces A–F. It deliberately omits unregistered service rooms, hypocausts, roofs, upper dwellings and detailed basin geometry.

normalized diagram units · 25 qualified parts · 1 reading settings

Explore plan & 3D ↗
Interactive architectural reading

Ostia · Grandi Horrea · Grandi Horrea: fifteen central rooms

Original reduced spatial reading: Ostia · Grandi Horrea · Grandi Horrea: fifteen central rooms

The central double row and surrounding U-court form a bounded working case. It follows Rickman’s composite topology, keeps source chronology disagreement explicit and omits the larger outer room wings.

normalized diagram units · 66 qualified parts · 1 reading settings

Explore plan & 3D ↗
Interactive architectural reading

Tempio Rotondo · court, porch and circular hall

Original reduced spatial reading: Tempio Rotondo · court, porch and circular hall

First source-grounded monument pilot within a staged Ostia programme; not a reconstruction of all Ostia or an exhaustive literature review.

metres anchored to reported diameter; other dimensions partly illustrative · 47 qualified parts · 1 reading settings

Explore plan & 3D ↗

Published drawings retain their roles

A drawing workbench.

Excavated states, phase proposals, conservation drawings and uninspected catalogue leads are distinguished. Source images remain at their owning publications unless compatible reuse is established.

0 drawings selectedReview selected records ↙
official-interpretive-plan

Capitolium: official orientation and detail plan

Forum, Capitolium and earlier Republican evidence · Lead diagram with scale, north arrow and visitor viewpoint

Prior edition record; consult source inspection

Inspected as a published monument drawing; not a newly registered field survey or a phase-separated plan.

Link only. No source pixels included in this study; no compatible reuse licence established.

Inspect the owning publication ↗
Parco, Capitolium

Full short text, official detail plan and C. Albo plan/elevation graphic inspected. The complete elevations in the Albo graphic are recognized as restored architectural presentation, not current survival.

Opening two paragraphs; lead orientation/detail plan; “Pianta e prospetti del Capitolium (C. Albo)”

published-restoration

Capitolium: C. Albo plan and proposed complete elevations

Forum, Capitolium and earlier Republican evidence · Caption “Pianta e prospetti del Capitolium (C. Albo)”

Prior edition record; consult source inspection

Complete roof, order and facade are restored architectural presentation; they are not the present standing elevation.

Link only. No source pixels included in this study; no compatible reuse licence established.

Inspect the owning publication ↗
Parco, Capitolium

Full short text, official detail plan and C. Albo plan/elevation graphic inspected. The complete elevations in the Albo graphic are recognized as restored architectural presentation, not current survival.

Opening two paragraphs; lead orientation/detail plan; “Pianta e prospetti del Capitolium (C. Albo)”

official-interpretive-plan

Theatre: official plan of the presented monument

Theatre and Piazzale delle Corporazioni · A portico;B arch area;C orchestra;D cavea;E stage

Prior edition record; consult source inspection

Drawing visually inspected. Visitor orientation, composite remains and reconstruction history require checking before any geometric tracing or historical phase model.

Link only. No source pixels included in this study; no compatible reuse licence established.

Inspect the owning publication ↗
Parco, Teatro

Full official text and visitor-oriented plan inspected. Reconstruction and 1912 excavation/restoration illustrations are separately identified in captions.

Opening paragraph; plan labels A–E; paragraph on late aquatic performances

official-interpretive-plan

Piazzale: temple, open court, portico and stationes

Theatre and Piazzale delle Corporazioni · A temple;B open area;C portico;D stationes

Prior edition record; consult source inspection

Drawing visually inspected. Visitor orientation, composite remains and reconstruction history require checking before any geometric tracing or historical phase model.

Link only. No source pixels included in this study; no compatible reuse licence established.

Inspect the owning publication ↗
Parco, Piazzale delle Corporazioni

Full official text, labelled plan and mosaic captions inspected. The individual mosaics and inscriptions have not been re-edited or counted as traffic statistics.

Paragraphs 1–4; plan A(temple),B(open area),C(portico),D(stationes)

official-interpretive-plan

Neptune baths: rooms and palaestra

Baths of Neptune · A frigidarium;B–C tepidaria;D calidarium;E palaestra;F athletes mosaic room

Prior edition record; consult source inspection

Drawing visually inspected. Visitor orientation, composite remains and reconstruction history require checking before any geometric tracing or historical phase model.

Link only. No source pixels included in this study; no compatible reuse licence established.

Inspect the owning publication ↗
Parco, Terme di Nettuno

Full official text and detailed plan inspected. A captioned generic reconstructed bath-room drawing is not treated as a measured section of this building.

Opening chronology; plan A–F; concluding repair notice

official-interpretive-plan

Garden Houses: blocks, garden, fountains and access

Garden Houses · A garden;B fountains;C entrances;D–G named buildings

Prior edition record; consult source inspection

Drawing visually inspected. Visitor orientation, composite remains and reconstruction history require checking before any geometric tracing or historical phase model.

Link only. No source pixels included in this study; no compatible reuse licence established.

Inspect the owning publication ↗
Parco, Case a Giardino

Full official text and plan inspected. Reconstructed facade/fountain illustrations remain separate from the excavated plan.

Opening paragraph; central-block/garden description; plan A–G; paragraphs on upper floors

official-interpretive-plan

Grandi Horrea: entrance, courtyard and storage cells

Grandi Horrea · A entrance;B courtyard;C cellae

Prior edition record; consult source inspection

Drawing visually inspected. Visitor orientation, composite remains and reconstruction history require checking before any geometric tracing or historical phase model.

Link only. No source pixels included in this study; no compatible reuse licence established.

Inspect the owning publication ↗
Parco, Grandi Horrea

Full official monument text and plan inspected; the Gismondi reconstructed view is recognized as a reconstruction. A parallel official grain-route page was also read, but no precise tonnage or transport-route model is adopted.

Opening dating comparison; late-second/early-third-century rebuilding; suspensurae paragraph; plan A–C

survey-context-and-stratigraphic-figure

Western harbour: core locations, stratigraphy and reconstructed scenario

Northwestern harbour and navalia-temple area · Article 88, fig. 1 on p. 2; fig. 12 on p. 19; reconstructed scenario fig. 13 on p. 23

Prior edition record; consult source inspection

Core/sondage correlations are evidence; fig. 13 is expressly a reconstruction scenario from Heinzelmann 2020. It must not be relabelled a measured photogrammetric state.

CC BY4.0 article with third-party credit exceptions; this edition links only.

Inspect the owning publication ↗
A. Vött, T. Willershäuser, H. Hadler, L. Obrocki, P. Fischer and M. Heinzelmann, Geoarchaeological evidence of Ostia’s river harbour operating until the fourth century AD, Archaeological and Anthropological Sciences 12 (2020), article 88

The 26-page article: introduction, field-context description, synthesis, disagreement and conclusions read. Fig. 12 on article p. 19 and the explicitly reconstructed scenario fig. 13 on p. 23 visually inspected. Not every laboratory result independently recalculated.

Article 88, pp. 1–3 and 19–24; figs. 1, 12–13; conclusions (4)–(6)

official-plan-with-separate-proposals

Tempio Rotondo: official plan and proposed sections

Tempio Rotondo · Plan A–D; two section captions crediting Pensabene and Briggs

Prior edition record; consult source inspection

The two section proposals are distinct from the surviving monument and from the original code-generated pilot.

Link only. No source pixels included in this study; no compatible reuse licence established.

Inspect the owning publication ↗
Parco, Tempio Rotondo

Official page and plan already downloaded and inspected in the same-day pilot; its text and figure classifications rechecked for this independent study.

Opening chronology; plan A–D; paragraph on spiral stairs; proposed section captions

historical-interpretation

Early Rotondo interpretation:1805 plan reproduced in 1912

Tempio Rotondo · Printed p. 301, fig. 70

Prior edition record; consult source inspection

Court colonnade is challenged by Briggs p. 164. Do not merge this historic interpretation into the later temple phase.

Link only. No source pixels included in this study; no compatible reuse licence established.

Inspect the owning publication ↗
Luigi Paschetto, Ostia colonia romana (1912)

Historical figure and adjacent text inspected in the same-day pilot and rechecked as an example of changing interpretation; no entire-volume reading claim.

Printed p. 301, fig. 70 and accompanying early-plan description

official-composite-plan

Capitolium: cella, porch and ascent

Capitolium · Lead monument plan with context inset, scale and north arrow

actual-figure-inspected

Presented monument; not a newly registered phase survey.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Parco · Capitolium

Current official HTML freshly retrieved; text and actual lead plan inspected. Albo graphic inspected as a proposed restored elevation, not standing fabric.

Opening two paragraphs; lead plan; C. Albo plan/elevations

published-restoration

Capitolium: Albo plan and complete elevations

Capitolium · Pianta e prospetti del Capitolium (C. Albo)

actual-figure-inspected

Completed elevations and roof are proposed; do not relabel as survival.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Parco · Capitolium

Current official HTML freshly retrieved; text and actual lead plan inspected. Albo graphic inspected as a proposed restored elevation, not standing fabric.

Opening two paragraphs; lead plan; C. Albo plan/elevations

historical-representation

Capitolium in a nineteenth-century engraving

Capitolium · P. Cacchiatelli and G. Cleter caption

caption-inspected

Historic representation, not a modern state survey. Figure located by caption; not registered as geometry.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Parco · Capitolium

Current official HTML freshly retrieved; text and actual lead plan inspected. Albo graphic inspected as a proposed restored elevation, not standing fabric.

Opening two paragraphs; lead plan; C. Albo plan/elevations

official-composite-plan

Neptune: bath rooms and palaestra

Baths of Neptune · Lead plan A–F

actual-figure-inspected

Room identification and broad relations only; not a new phased survey.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Parco · Baths of Neptune

Fresh text and actual A–F plan inspected. Fremura/Pasquinucci illustration is a generic Roman bath-room reconstruction, not a measured Neptune section.

Chronology; plan A–F; upper dwellings and later repairs; generic bath-room caption

generic-reconstruction

Generic Roman bath-room reconstruction

Comparandum: Roman thermal room · A. Fremura and M. Pasquinucci caption

actual-figure-inspected

This is not a Neptune-specific measured section.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Parco · Baths of Neptune

Fresh text and actual A–F plan inspected. Fremura/Pasquinucci illustration is a generic Roman bath-room reconstruction, not a measured Neptune section.

Chronology; plan A–F; upper dwellings and later repairs; generic bath-room caption

official-composite-plan

Grandi Horrea: official entrance, court and cellae

Grandi Horrea · Lead plan A–C

actual-figure-inspected

Composite visitor plan; phase assignment must be reconciled with older drawings.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Parco · Grandi Horrea

Fresh text and actual plan inspected. Composite visitor plan and Gismondi whole-building reconstruction are distinct. Chronological difference from Rickman retained.

Opening date alternatives; later rebuilding paragraph; plan A–C; Gismondi caption

published-restoration

Grandi Horrea: Gismondi reconstructed view

Grandi Horrea · Disegno ricostruttivo degli Horrea visti da nord

actual-figure-inspected

Complete roofs and facades are a proposal; no source mesh copied.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Parco · Grandi Horrea

Fresh text and actual plan inspected. Composite visitor plan and Gismondi whole-building reconstruction are distinct. Chronological difference from Rickman retained.

Opening date alternatives; later rebuilding paragraph; plan A–C; Gismondi caption

published-composite-plan

Grandi Horrea: Rickman figure 10 · composite plan

Grandi Horrea · Printed p. 44, fig. 10

actual-figure-inspected

Draws on earlier Calza/Scavi publications; early central-block phase assignment differs from current official summary. No invented reconciliation.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Rickman 1971 · Roman Granaries and Store Buildings

Printed pp. 44–49 and all three cited drawings visually inspected; the full book was not read.

Printed pp. 44–49; fig. 10 on p. 44, fig. 11 on p. 46, fig. 12 on p. 49

published-phase-interpretation

Grandi Horrea: Rickman figure 11 · phase 1

Grandi Horrea · Printed p. 46, fig. 11

actual-figure-inspected

Draws on earlier Calza/Scavi publications; early central-block phase assignment differs from current official summary. No invented reconciliation.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Rickman 1971 · Roman Granaries and Store Buildings

Printed pp. 44–49 and all three cited drawings visually inspected; the full book was not read.

Printed pp. 44–49; fig. 10 on p. 44, fig. 11 on p. 46, fig. 12 on p. 49

published-phase-interpretation

Grandi Horrea: Rickman figure 12 · phase 2

Grandi Horrea · Printed p. 49, fig. 12

actual-figure-inspected

Draws on earlier Calza/Scavi publications; early central-block phase assignment differs from current official summary. No invented reconciliation.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Rickman 1971 · Roman Granaries and Store Buildings

Printed pp. 44–49 and all three cited drawings visually inspected; the full book was not read.

Printed pp. 44–49; fig. 10 on p. 44, fig. 11 on p. 46, fig. 12 on p. 49

official-composite-plan

Garden Houses: blocks, garden and fountains

Garden Houses · Lead plan A–G

actual-figure-inspected

Ground relationships distinct from restored upper floors.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Parco · Garden Houses

Fresh text retrieved; lead plan inspected in same-day independent study; Ricciardi facade and fountain graphics visually rechecked for this atlas.

Plan A–G; Ricciardi facade and fountain reconstruction captions

published-restoration

Garden Houses: Ricciardi facade reconstruction

Garden Houses · Panel 76 figure 2

actual-figure-inspected

Full facade elevation is a published reconstruction, not surviving complete apartments.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Parco · Garden Houses

Fresh text retrieved; lead plan inspected in same-day independent study; Ricciardi facade and fountain graphics visually rechecked for this atlas.

Plan A–G; Ricciardi facade and fountain reconstruction captions

published-restoration

Garden Houses: Ricciardi fountain reconstruction

Garden Houses · Panel 76 figure 4

actual-figure-inspected

People, water and cover are an illustrative reconstruction.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Parco · Garden Houses

Fresh text retrieved; lead plan inspected in same-day independent study; Ricciardi facade and fountain graphics visually rechecked for this atlas.

Plan A–G; Ricciardi facade and fountain reconstruction captions

official-composite-plan

Theatre: presented monument plan

Theatre · Lead plan A–E

actual-figure-inspected

Modern rebuilding and ancient fabric are not separated by this visitor graphic.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Parco · Theatre

Fresh text; lead visitor plan previously inspected. Actual reconstruction drawing with completed cavea and stage elevation rechecked. It is not an excavation state survey.

Plan A–E; Pensabene/Pintucci reconstruction

published-restoration

Theatre: Pensabene/Pintucci plan and elevation proposal

Theatre · Ricostruzione del teatro

actual-figure-inspected

Complete cavea and stage elevation are not a state survey of ancient survival.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Parco · Theatre

Fresh text; lead visitor plan previously inspected. Actual reconstruction drawing with completed cavea and stage elevation rechecked. It is not an excavation state survey.

Plan A–E; Pensabene/Pintucci reconstruction

official-composite-plan

Piazzale: temple, open area, porticoes and stationes

Piazzale delle Corporazioni · Lead plan A–D

actual-figure-inspected

Several construction and mosaic episodes, not one synchronous commercial precinct.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Parco · Piazzale delle Corporazioni

Fresh text; actual lead precinct plan inspected in same-day independent study. Mosaic photographs are not a licensed asset set.

Plan A–D and corporate-function paragraph

infrastructure-interpretation

Ostia: known and probable water-network paths

Water infrastructure · Lead network diagram and legend

actual-figure-inspected

Known, probable and secondary routes retain separate graphic roles; no exact underground route inferred.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Parco · Water network

Fresh text and actual network diagram inspected: known main lines, probable main lines, secondary network and distributors are separately encoded. Castellum reconstruction visually inspected.

Lead network diagram legend; castellum aquae reconstruction caption; final water-use paragraph

published-restoration

Castellum aquae: credited reconstructed building

Water infrastructure · P. Martinez, K. Cain, T. Gill in Bukowiecki, Dessales, Dubouloz caption

actual-figure-inspected

Roofed distributor reconstruction; no metric envelope or flow model admitted.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Parco · Water network

Fresh text and actual network diagram inspected: known main lines, probable main lines, secondary network and distributors are separately encoded. Castellum reconstruction visually inspected.

Lead network diagram legend; castellum aquae reconstruction caption; final water-use paragraph

official-composite-plan

Baths of Mithras: rooms, noria and underground cult area

Baths of Mithras · Lead A–H plan

actual-figure-inspected

Bath rooms and underground shrine need vertically separated registration.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Parco · Baths of Mithras

Fresh full text and actual lead bath plan, Caraffa plan and Pascolini interior reconstruction inspected. Noria reconstructions located by caption, not yet admitted as geometry.

Lead A–H plan; G. Caraffa mithraeum plan; Pascolini reconstruction captions

published-monument-plan

Mithraeum: G. Caraffa plan

Mithraeum of the Baths of Mithras · Pianta del mitreo (G. Caraffa)

actual-figure-inspected

Original scale visible; no new tracing or stair risers derived here.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Parco · Baths of Mithras

Fresh full text and actual lead bath plan, Caraffa plan and Pascolini interior reconstruction inspected. Noria reconstructions located by caption, not yet admitted as geometry.

Lead A–H plan; G. Caraffa mithraeum plan; Pascolini reconstruction captions

published-restoration

Mithraeum: Pascolini reconstructed interior

Mithraeum of the Baths of Mithras · Disegno ricostruttivo dell’interno del mitreo (A. Pascolini)

actual-figure-inspected

Vault, cult ensemble and finished surfaces are reconstructed presentation.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Parco · Baths of Mithras

Fresh full text and actual lead bath plan, Caraffa plan and Pascolini interior reconstruction inspected. Noria reconstructions located by caption, not yet admitted as geometry.

Lead A–H plan; G. Caraffa mithraeum plan; Pascolini reconstruction captions

official-composite-plan

Mithraeum of the Serpents: precinct and room plan

Mithraeum of the Serpents · Lead monument plan

actual-figure-inspected

Backroom conversion and retained decoration must remain separate phases.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Parco · Mithraeum of the Serpents

Fresh text and actual plan/section inspected. The section shows masonry and retained decoration; no unsupported completed room volume inferred.

Lead plan; published section caption

published-section

Mithraeum of the Serpents: published section

Mithraeum of the Serpents · M. Lilli, P. Pinna, G. Paquali, G. Caccianiga caption

actual-figure-inspected

No uninspected complete vault/elevation inferred.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Parco · Mithraeum of the Serpents

Fresh text and actual plan/section inspected. The section shows masonry and retained decoration; no unsupported completed room volume inferred.

Lead plan; published section caption

official-composite-plan

Felicissimus: shrine and benches

Mithraeum of Felicissimus · Lead plan A–B

actual-figure-inspected

Bench presence does not establish crowd capacity or a full ritual reconstruction.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Parco · Mithraeum of Felicissimus

Fresh text and both actual plan graphics inspected. The mosaic plan identifies image/bench relationships, not a new resident census or measured ritual performance.

Lead plan A–B; Becatti/Pascolini mosaic plan

published-monument-plan

Felicissimus: mosaic and bench plan

Mithraeum of Felicissimus · G. Becatti, A. Pascolini: Planimetria con mosaici

actual-figure-inspected

Figurative surface plan; no complete room elevation or copied mosaic texture.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Parco · Mithraeum of Felicissimus

Fresh text and both actual plan graphics inspected. The mosaic plan identifies image/bench relationships, not a new resident census or measured ritual performance.

Lead plan A–B; Becatti/Pascolini mosaic plan

stratigraphic-correlation

Western harbour: core and excavation correlation

Northwestern harbour · Article 88 p. 19 fig. 12

actual-figure-inspected-in-same-day-study

Separate sampled strata from completed historical scene; no imported harbour mesh or exact city-abandonment date.

Article states CC BY 4.0 with third-party credit exceptions; this edition links only and reproduces no figure pixels.

Inspect the owning publication ↗
Vött et al. 2020 · Ostia river harbour

Selected publication figures inspected; source images are not reproduced and no mesh was imported.

Article 88: fig. 12 on p. 19; fig. 13 on p. 23; pp. 20–24

published-reconstruction-scenario

Western harbour: reconstructed scenario

Northwestern harbour · Article 88 p. 23 fig. 13

actual-figure-inspected-in-same-day-study

Separate sampled strata from completed historical scene; no imported harbour mesh or exact city-abandonment date.

Article states CC BY 4.0 with third-party credit exceptions; this edition links only and reproduces no figure pixels.

Inspect the owning publication ↗
Vött et al. 2020 · Ostia river harbour

Selected publication figures inspected; source images are not reproduced and no mesh was imported.

Article 88: fig. 12 on p. 19; fig. 13 on p. 23; pp. 20–24

observed-wall-and-separate-proposal

Forum T5: wall and proposed reconstructed temple

Republican Forum · Figures 1–2

text-and-captions-inspected

Full-resolution geometry not registered; figure 1 and figure 2 have different evidence roles.

Source link only. No compatible source-pixel or external-mesh reuse licence established; no raster or external mesh admitted.

Inspect the owning publication ↗
Ostia Forum Project · Search for the First Forum

Same-day retained page text/captions rechecked. Wall versus proposed reconstruction identified; individual full-resolution figures/mesh not registered for this atlas.

Figures 1–2 and accompanying T5 paragraphs

Compare evidence before appearances

Two drawings. Different questions.

Coverage and the next admission decisions

Further architectural candidates.

Priority 1 · original-relational-case-built

Capitolium

A clear plan supports the relation of cella, porch and ascent without adding a complete order.

Admission requirements

  • Register a measured state plan and restoration fabric before metric expansion.

Normalized working case only; no ancient elevation or complete roof.

Parco · Capitolium ↗

Priority 1 · original-relational-case-built

Baths of Neptune

A–F labels support a readable thermal-suite/exercise-court model.

Admission requirements

  • Read full bath publication, separate construction phases and register basins/service passages.

Composite diagram; no hypocaust, roof or mandatory bathing route.

Parco · Baths of Neptune ↗

Priority 1 · original-relational-case-built

Grandi Horrea

Rickman provides explicit 8+7 topology and U-court relations.

Admission requirements

  • Reconcile modern chronology with Calza/Rickman phase interpretations; register measured openings and suspensurae.

Central block only. Contradictory source chronology is exposed, not merged.

Rickman 1971 · Roman Granaries and Store Buildings ↗
Parco · Grandi Horrea ↗

Priority 2 · inspected-drawings-await-registered-case

Garden Houses

Rich ground plan plus separately credited facade/fountain proposals.

Admission requirements

  • Read Packer and later housing studies; register dwelling/upper-floor evidence.

No standard complete apartment-block massing from one ideal elevation.

Parco · Garden Houses ↗

Priority 2 · restoration-audit-required

Theatre

Strong plans and proposals can support a sectional case after modern fabric is distinguished.

Admission requirements

  • Create ancient/restored fabric ledger, compare excavation plans and current site photos.

Present cavea and vaults substantially rebuilt; no untouched-survival model.

Parco · Theatre ↗
Daffara · Restoration of the Ostia theatre ↗

Priority 2 · plan-inspected-await-phase-ledger

Piazzale delle Corporazioni

Precinct relationships and mosaics lend themselves to synchronized plan discussion.

Admission requirements

  • Separate Augustan/Claudian/second-century spaces and mosaic episodes; retain deity uncertainty.

No exact merchant voyages, traffic volume or timeless room functions.

Parco · Piazzale delle Corporazioni ↗

Priority 2 · plans-and-interior-proposal-inspected

Baths of Mithras and underground shrine

Good plan/cult-space linkage and water-lifting evidence.

Admission requirements

  • Register upper/lower floor levels; read excavation record and noria studies; separate statue cast.

No vault/roof derived from artistic proposal alone.

Parco · Baths of Mithras ↗

Priority 2 · plan-and-section-inspected

Mithraeum of the Serpents

A compact room and section can support a bounded later conversion study.

Admission requirements

  • Register surviving bench profiles and phase history from the specialist publication.

No ritual crowding or complete room elevation invented.

Parco · Mithraeum of the Serpents ↗

Priority 2 · plans-inspected

Mithraeum of Felicissimus

Detailed mosaic/bench relation enables a future close architectural reading.

Admission requirements

  • Read specialist plan publication and wall/bench state; review image rights.

No copied mosaic texture, roof or exact initiation ceremony.

Parco · Mithraeum of Felicissimus ↗

Priority 2 · network-and-reconstruction-inspected

Water network and castellum aquae

Known/probable route distinction makes an evidence-aware infrastructure layer useful.

Admission requirements

  • Consult full aqueduct/wooden-wheel publications, vertical datums and distributor construction evidence.

Probable lines remain hypothetical; no complete buried pipe network.

Parco · Water network ↗

Priority 3 · preliminary-page-text-and-captions

Republican Forum and T5

Promising buried/standing relationships and explicit research proposals.

Admission requirements

  • Read final OFP reports and inspect registered metric figures/meshes before modelling.

Current caption-level register cannot support a new Republican skyline.

Ostia Forum Project · Search for the First Forum ↗
Parco · Capitolium ↗

Priority 3 · primary-figures-inspected

Northwestern harbour and Portus connections

Excavation/core correlations can anchor a sectional harbour dossier.

Admission requirements

  • Reconcile competing harbour chronology and register cores, water levels and building plans.

Completed scenario is not surveyed geometry; harbour termination is not city-wide abandonment.

Vött et al. 2020 · Ostia river harbour ↗

Priority 3 · text-led-context-research

Later repair, burial and Area A/Porta Marina

Later lives require context-specific documentation rather than a vanished-city animation.

Admission requirements

  • Read final recent specialist reports and register excavation context/phase plans.

No model admitted from preliminary textual interpretations alone.

Parco · Ostia Post Scriptum results ↗
Boin 2013 · Ostia in Late Antiquity ↗

The inspection boundary

What this expansion establishes.

Searched and inspected

  • Fresh official Parco pages for ten monuments/infrastructure themes; primary report/architectural-publication searches for horrea plans and phase drawings.
  • Bibliographic discovery considered Ostia, Portus, horrea and Rickman; individual entries distinguish discovery from consultation.
  • Same-day independent study evidence for Forum, harbour, restoration and later contexts was reused with its consultation bounds.
  • Ten official pages and the individually marked water, mithraea, section and reconstruction drawings inspected.
  • Capitolium, Neptune and Grandi Horrea detailed plans; Rickman printed pp. 44–49 and figs. 10–12.
  • Twenty-eight source drawing records retain actual-figure, caption-only and prior same-day inspection distinctions.

Uninspected, unresolved or unavailable

  • Complete Scavi di Ostia corpus and every Notizie degli Scavi annual report.
  • Complete original Calza warehouse publication and later specialist reassessments; Rickman’s full book.
  • Complete volumes by Packer, Hermansen, Meiggs and other identified authors remain unconsulted.
  • Full OFP registered data, bath/fountain/water-network final measured datasets, recent Post Scriptum specialist reports and external meshes.
  • Three additional working architectural diagrams, not three newly measured models.
  • No whole-city reconstruction or exhaustive plan/mesh coverage claim.
  • Every numeric geometric coordinate and section is conventional except the explicitly reported warehouse cell counts.
  • Model units are normalized; an m scale or metric exported length would misrepresent this dataset.
  • Source drawing images are not reproduced; public records link to the original publications.
  • Web parser timed out on the Grandi Horrea page; direct fresh HTML retrieval succeeded.
  • Rickman: selected pages and drawings consulted as recorded in the source entry; no reading of the complete volume is claimed.